Lifetime Impact 44" Telescoping Portable Poolside Basketball System Item: 2016427 | Model: 1301
  • description

      Make baskets and beat the heat with this portable basketball system designed for poolside fun. The height of the backboard adjusts without tools so you can get started quickly and easily. A UV-protected, high-impact polyethylene plastic backboard and powder-coated, rust-resistant finish ensure lasting sturdiness.

      Product Features:

    • Weather-resistant, high-impact polyethylene plastic backboard with fade-resistant graphics for enduring strength
    • Powder-coated, rust-resistant 3" pole offers sturdy support
    • 27-gal. roller base provides stability and portability
    • Backboard height adjustment requires no tools for easy setup
    • 18" classic blue rim made of 5/8" solid steel supported by 1/2" steel braces
    • Height adjusts from 7'6" to 10' in 6" increments
    • Includes backboard, rim, 50-gram net, round steel pole and base
    • Warranty: 5 years limited

    • (Model 1301)

      Basketball not included.

      For additional questions regarding this product, please contact the Manufacturer's Customer Service Department at 1-800-225-3865

  • specifications
    Estimated Delivery: 5-7 Business Days
    Material(s): Polyethylene Plastic, Powder-Coated Steel
    Dimensions: 50"L x 44"W x 78"H
    Weight: 52 lbs.
  • reviews (0)
  • shipping + returns

    Shipping and Delivery

    BJs.com uses several different shipping methods to best serve our Members. More than one shipping method is available for certain items. Please be aware that not all shipping methods are available for all items.* By clicking on the "Change" button in the "Shipping Methods" section of the "Final Order Review" page, you will be able to see a list of available shipping options. If a certain shipping method is not displayed, we regret that it is not available for that item.


    * Shipping information is always approximate and may be based on information given to us by manufacturers and vendors.


    Orders placed via these shipping options are not guaranteed to be delivered within a certain time frame. Standard Ground is generally the least expensive option.


    Standard Ground: Standard Ground includes delivery via U.S. Priority Mail®, United States Postal Service®, UPS® Ground and FedEx® Ground.


    Expedited Ground: Items upgraded to Expedited Ground will ship via UPS®, FedEx® Ground or a similar carrier. Expedited Ground is not available for all items.


    2nd Day Air: Items upgraded to 2nd Day Air will ship via UPS®, FedEx® Ground or a similar carrier. 2nd Day Air is not available for all items.


    Overnight: Items upgraded to Overnight will ship via UPS®, FedEx® Ground or a similar carrier. Overnight shipping is not available for all items.


    Priority Overnight: Items upgraded to Priority Overnight will ship via UPS®, FedEx Ground® or a similar carrier. Priority Overnight is not available for all items.

    BJs.com Return Policy

    BJ's selects the highest quality Merchandise for our Members and stands behind the products we sell. If you are not completely satisfied with your purchase, you are entitled to a refund or exchange subject to the following guidelines. Please return your product to the nearest BJ's Club location or by following the instructions here.


    Proper Conditions for Return and Credit
    Returned merchandise must be in new condition with its original packing and accessories intact. Items purchased over 1 year ago will not be considered in new condition. If you are returning a product please check to make sure your return meets the following conditions:

    • Computers and electronics are returnable within 90 days of the shipping date
    • CDs, DVDs, computer software and video games must be unopened

    We regret that BJ’s cannot cover the cost of shipping for products returned due to buyer’s remorse.

    Non-Returnable Items:

    • Bulk orders*
    • Gift Cards
    • Items with gas, oil or fuel added
    • Opened CDs, DVDs, computer software and video games
    • Products under a manufacturer’s warranty which have service center only restrictions and are not operating properly must be repaired according to the procedures/repair centers specified in the User Manual, and may not be returned to BJ’s. Click here for a list of categories

    *Bulk online sales are final and cannot be returned; reference Terms of Use available on BJs.com by clicking here, or contact your BJ’s business partner with questions.


    If you have ordered one of these non-returnable items, please inspect the item carefully and if possible, refuse delivery of incorrect or damaged products. Once the item has been accepted it will be deemed to be the correct item and in good working condition. Any issues that arise after the item is signed for must be resolved through the manufacturer’s warranty.

    Returning an Item Online

    Please see BJs.com's return policy before initiating a return.
    You may return your item at any BJ's Club location or by following the instructions below.

    1. Select “Order Status” from the top navigation of any page.
    2. If you placed your order while signed in to your online account, please sign in to your account using your username and password.
      If you placed your order while shopping as a guest, please enter your order number, recipient's email address, and the ship-to ZIP code, then click “Continue.”
    3. Your order information should now be displayed. Please review it and click the “Return”" link next to the item you would like to return.
    4. Select from the dropdown list the reason that most closely corresponds to your reason for returning the item, the package condition, and any comments you would like to make.
    5. Select “Continue.”
    6. Your return authorization request has now been made and you will receive an email within 3-5 business days (often sooner), with complete return instructions. If you do not receive an email with complete return instructions within 3-5 business days, please contact us at 866-4BJS-WEB (866-425-7932). BJ’s Member Care Representatives are available Monday - Friday, 9AM - 7PM E.T., Saturday, 9AM - 6PM E.T. and Sunday, Noon - 6PM E.T.

    PLEASE NOTE: you will not be allowed to initiate a return beyond 30 days from your date of shipping. After 30 days, please contact member care for return instructions.



    Damaged Orders
    If a signature is required please inspect your package carefully before signing for it. If after accepting the package you determine that there are damaged or defective parts, please contact the manufacturer for replacement parts. For further assistance, contact BJ’s Member Care. Do not discard the boxes or packing materials, as they may be needed to ship the item back.



    Shipping Error
    If you receive an incorrect product, please review your order information to be certain that there were no errors in the order process. If you determine that you received an item you did not order, please return your product to the nearest BJ’s Club location or initiate a return online (see “Returning an Item” above for instructions).



    Return Shipping Costs
    If you refuse your delivery without inspection, miss your delivery appointment(s) or return a non-defective or undamaged product, you will incur original shipping charges along with actual return shipping fees. In the event that your returned merchandise was mis-shipped, damaged or defective, BJ’s Member Care team will be happy to reimburse you for return shipping costs. Please contact BJ’s Member Care and we will be able to assist you.

Item Added Successfully

Error Adding to Wishlist

Item Added Successfully

Error Adding to Wishlist