Lifetime Impact Telescoping Portable Poolside Basketball System
Item: 2016427 Model: 1301
(15)
(15)
$169.99
FREE SHIPPING
Estimated Delivery: 5-7 Business Days
Online Only
Become a basketball star without leaving your pool when you play with the Lifetime Impact Telescoping Portable Poolside Basketball System. Simply roll the base to the side of the pool, adjust the backboard to your desired height, and get the game started. Thanks to the UV-protected, high-impact polyethylene plastic backboard, this fun basketball system will provide hours of friendly competition in the pool.

Product Features:

  • Weather-resistant, UV-protected, high-impact polyethylene plastic backboard features fade-resistant graphics
  • 18" classic blue rim is made from 0.63" solid steel and is supported by 0.5" steel braces for optimal strength
  • Sturdy, powder-coated, rust-resistant 3" pole
  • 27-gal. roller base offers easy portability
  • Backboard height adjusts from 7'6" to 10' in 6" increments with no required tools
  • Includes backboard, rim, 50g net, round steel pole and base
  • Warranty: 5 years limited

  • (Model 1301)

    Basketball not included
    Model Number 1301
    Estimated Delivery 5-7 Business Days
    Material(s) Polyethylene, Steel
    Quantity 1
    Includes Backboard, Rim, 50g Net, Round Steel Pole, Base
    Dimensions 50"L x 44"W x 78"H
    Item Length 50"
    Item Width 44"
    Item Height 78"
    Weight 52 lbs.
    Warranty 5 Years Limited
    upc 81483013015
    Become a basketball star without leaving your pool when you play with the Lifetime Impact Telescoping Portable Poolside Basketball System. Simply roll the base to the side of the pool, adjust the backboard to your desired height, and get the game started. Thanks to the UV-protected, high-impact polyethylene plastic backboard, this fun basketball system will provide hours of friendly competition in the pool.

    Product Features:

  • Weather-resistant, UV-protected, high-impact polyethylene plastic backboard features fade-resistant graphics
  • 18" classic blue rim is made from 0.63" solid steel and is supported by 0.5" steel braces for optimal strength
  • Sturdy, powder-coated, rust-resistant 3" pole
  • 27-gal. roller base offers easy portability
  • Backboard height adjusts from 7'6" to 10' in 6" increments with no required tools
  • Includes backboard, rim, 50g net, round steel pole and base
  • Warranty: 5 years limited

  • (Model 1301)

    Basketball not included
    Model Number 1301
    Estimated Delivery 5-7 Business Days
    Material(s) Polyethylene, Steel
    Quantity 1
    Includes Backboard, Rim, 50g Net, Round Steel Pole, Base
    Dimensions 50"L x 44"W x 78"H
    Item Length 50"
    Item Width 44"
    Item Height 78"
    Weight 52 lbs.
    Warranty 5 Years Limited
    upc 81483013015